When the Genaro Trestle was built years ago, no one could have imagined the need for two tracks. When my father and I completed the original railroad, it was essentially a long dog bone looping around both sides of the house. The main line measured about 1,750 feet, and at the time we never dreamed it would continue to grow.
But when you dream, anything is possible.
The addition of the Mountain Division created a new challenge. The Genaro Trestle had become a bottleneck. My first solution was to turn it into a gauntlet bridge by installing a switch at each end. That eliminated the need for three rails by allowing the two routes to share a single track across the trestle. It worked… at least for a while.
During our annual meets, however, train traffic would back up waiting for the bridge to clear. The gauntlet had become the railroad’s biggest traffic jam.
My first thought was to build an entirely new trestle alongside the existing one. But after having just completed the new 220-foot trestle, the idea of starting another project of that size was more than a little intimidating. Part of me said, Go for it! The practical side of me said, Leave well enough alone.
Then one day, while a work crew was helping ballast the Mountain Division, I mentioned the problem. Two of the guys walked down to inspect the trestle. One of them works on full-size railroad maintenance crews, so I was very interested in his opinion.
Their solution surprised me.
“Why not just widen the deck?”
My first reaction was concern over whether the existing structure would be strong enough. After giving it a lot of thought, I sat down and drew up a plan.
The solution was to sandwich the tops of every bent with 2×8×72-inch pressure-treated lumber, effectively widening the deck while strengthening the entire structure at the same time.
The work began by removing all of the handrails and their supports. That turned out to be more difficult than expected. Years ago, I had drilled the bolt holes a little too tight, and as the wood expanded over time the bolts became firmly wedged in place. Getting them apart took far longer than I had anticipated.
Once everything was removed, I installed the new 2×8s, added side braces, and then reinstalled the original handrails and hardware.
This past week I removed all of the ties and raised the ends of the trestle so I could replace the 4×4 end supports. Next week I’ll begin installing the remaining 2×8s to complete the widened deck, followed by a new set of 2×4 ties.
Then comes the fun part—laying two tracks across the trestle.
The new tracks will be spaced on 36-inch centers, providing plenty of clearance for passing trains while keeping the wheel loads primarily over the original center portion of the trestle. I’ll also widen the approaches at both ends using concrete retaining wall blocks before reinstalling the connecting track.
When all is finished, one of the biggest bottlenecks on the Nasonville Valley Railroad will be gone.
After this project, though, I really do need to stop building for a while and simply enjoy running trains!
For now, here are a few photos of the work in progress.