Live Steam by Father Finelli

Live Steam by Father Finelli

Live Steam Railroading

Live Steam by Father Jay Finelli
  • About
    • Contact
    • Father’s RR Story
    • My Locomotives
      • American 4-4-0
      • Consolidation (2-8-0)
      • OS Baldwin Mogul
    • Nasonville Valley RR
    • Sitemap
  • Clubs
    • Live Steam Clubs
    • Live Steam Events
  • Gallery
    • Cornell’s Sugar Engine
    • Father’s Locomotives
      • American Rebuild
    • Finger Lakes 40th Anniversary
    • Moving Bridgeport
    • Nasonville Valley
      • Covered Bridge
      • Grading
      • Layout
      • Turntable
      • Turntable 2
      • Winter 2009
    • New Jersey – October 2001
    • Tunkhannock Viaduct
    • Valley Extension – 01
    • Visit to Guidos
    • Walt Disney World – 2004
    • Waushakum Galleries
      • 2002 Annual Meet
      • 2002(b) Annual Meet
      • 2006 Annual Meet
      • 2008 Annual Meet
      • 2009 Annual Meet
      • 2009 New Years Run
      • 2010 Annual Meet
      • Don Hill’s Memorial Steam-Up
  • Links
    • Other Live Steam Pages
    • Railroad Museums
    • Railroads, etc…
  • Login
  • Projects
    • Beginners
    • Conversion Charts
    • Hydrostatic Lubricator
    • Project Links
    • Timing Stevenson Valve Gear
  • Suppliers
    • Accessories
    • Boilers
    • Castings
    • Fittings
    • Gauge 1
    • I.B.L.S.
    • Locomotives
    • Machines
    • Machinists
    • Marine
    • Media
    • Metal Stock
    • Rail
    • Rolling Stock
    • Stationary Engines
    • Tools
  • Tips
    • Turning Wheels
  • Videos
    • Nasonville Valley in the rain
    • Tour of the Nasonville Valley
    • Trains in Kansas City, KS
Live Steam by Father Finelli - Page 2 << 1 2 3 4 … 24 25 >>  
 

Post navigation

← Older posts
Newer posts →

Covered Bridge Update #5 and more

Live Steam by Father Finelli Posted on May 8, 2026 by Fr. Jay FinelliMay 25, 2026

During my day off this week, work continued steadily on the new covered bridge approach. I managed to get the forms in place for the bridge’s new abutments. The first one went slowly as I worked out the best method, but once I developed a system, the second came together much more quickly. At this point, all that remains is installing the rebar before the concrete can be poured.

After the rebar is in place, I’ll begin setting the form for the station slab so everything will be ready for the concrete pour at the same time. Once the concrete has cured, I’ll build up the outside of both abutments by about 14 inches to help protect the wood structure from direct contact with the surrounding dirt and moisture.

This time, I’ve decided not to mix the concrete myself. When I built the abutments for the new trestle, each one required forty-two bags of concrete, and that was enough to convince me to take a break from hand-mixing on a project of this size. Having the concrete delivered should make the process go much more smoothly and allow several parts of the project to move ahead together.

In addition to the bridge work, I now have the lumber needed to widen the top of Genaro Trestle for double-track operation. I also received another shipment of rail and joiners from Accu-Tie. The new rail will allow me to continue laying track from the Mountain Division, past the new station area, through the covered bridge, and all the way to Genaro Trestle. There is also enough material to complete the second track across the widened trestle.

Check out a few pictures below showing the latest progress on the project.

Cross Section of the bent
Accu-tie-Rail

Forms for the abutments ready to pour

Posted in News, Railroad | Leave a reply

Raising the covered bridge – Update #5

Live Steam by Father Finelli Posted on May 1, 2026 by Fr. Jay FinelliMay 25, 2026

When we pulled the covered bridge from its original location, the steel channel bent and detached. Rather than simply replacing it in kind, I took the opportunity this week to improve the structure by installing 4×6 beams—bringing the bridge more in line with traditional covered bridge construction.

At the same time, I began removing some of the existing fill to prepare for the new abutments. A friend kindly loaned me his forms, which will be a great help moving forward. The plan for next week is to set those forms in place and begin preparing for the concrete pour.

Below are a couple of photos showing the underside of the bridge. The entire original structure is built from rough-cut pine sourced from a local sawmill. Remarkably, it remains in excellent condition—well preserved thanks to the protection provided by the bridge’s roof.

View of the underside of the covered bridge
View of the underside of the covered bridge
Posted in News, Railroad | Leave a reply

Raising the covered bridge – update #4

Live Steam by Father Finelli Posted on April 24, 2026 by Fr. Jay FinelliApril 24, 2026

Yesterday was moving day on the railroad.

Originally, the plan was to raise the bridge in place using cribbing, then build up the abutments underneath to meet the new grade. But a good friend suggested a better approach: lift the entire bridge out and move it using the forks on the backhoe bucket.

That’s exactly what we did.

With the bridge now safely out of the way, there’s plenty of room to construct the new abutments properly and bring everything up to the correct elevation. It’s a much cleaner—and ultimately more precise—way to tackle the job.

I’ve included a video below so you can see the move in action.

Posted in News, Railroad | Leave a reply

Raising the Covered Bridge #3 and other work

Live Steam by Father Finelli Posted on April 17, 2026 by Fr. Jay FinelliMay 25, 2026

Here are a few photos that tell the story of the work accomplished between last November and this spring. We are truly making steady progress, with much more to come in the week ahead. I’ve included the dates and locations to highlight the transformation over time.

Covered bridge before raising the grade 11/5/25
Covered bridge after raising the grade 3/30/26
Looking towards the turntable before 10/29/25
Looking towards the turntable after 4/15/26
Looking behind the turntable before 10/29/25
Looking behind the turntable after 4/15/26

w

Posted in News | Leave a reply

NVRR Station – Update #2

Live Steam by Father Finelli Posted on March 4, 2026 by Fr. Jay FinelliMay 25, 2026

Over the past few weeks, during my day off, I’ve been able to make some significant progress on the Nasonville Valley Railroad Station. The front wall is now complete, along with the back wall—which I built in two sections—and both side walls.

At this point, all I need is for the snow to melt and for a stretch of good weather so I can prepare and pour the foundation. Once the foundation is in place and properly cured, I’ll be able to raise the walls and begin work on the roof and the covered waiting area.

In the photo below, the front wall with the bay ticket window is standing. The two side walls and the back wall are lying on their sides to the left of the picture. I’m not able to stand them up in the shop because they are about one inch too tall for the ceiling. The front wall will also receive an additional stabilizing member along the top.

Posted in News, Railroad | Leave a reply

NVRR Station

Live Steam by Father Finelli Posted on February 18, 2026 by Fr. Jay FinelliMay 25, 2026

What is a railroad without a station? A station is the heart of a railroad—the place where people gather, where passengers catch a ride, and where trains are watched, admired, and enjoyed. Especially on a Live Steam backyard railroad, a station adds something essential. It becomes a focal point that draws attention, excitement, and community.

I’ve wanted to build a station for the railroad for a long time. While working on the line this past fall, a spot between the turntable and the new trestle caught my eye. I could immediately see it in my mind: the building itself, a covered waiting area, and a natural place for people to pause and gather. It won’t be a large structure, but it will serve as a strong visual anchor for the railroad and a comfortable place to linger during meets. And, truth be told, it may even double as a small hermitage—a quiet place for prayer and recollection.

The design has been evolving for quite some time, but this week things finally moved from planning to action. After doing the final figuring, I picked up the first 2×4s at Lowe’s, and the project officially began. There have already been a few minor tweaks along the way, including a slight adjustment to the height so all four walls can be built inside my wood shop and then carried out and assembled on site. Even so, the finished station is clear in my mind, complete with a bench and a bit of subtle mood lighting.

The station area will also gain a second track, allowing trains to continue rolling smoothly through the area while people gather and enjoy the scene.

This is my current project until the Consolidation boiler returns. Then, I put old Pio back together.

Here are a few pictures.

Part of the front wall. Opening for the bay window.
Rough drawing of the bay
Not much room to move around in the metal shop
Cutting the first 2×4
Front wall partly build with roof extension simulation
Windows ready and waiting
Posted in News, projects, Railroad | 2 Replies

Raising the Covered Bridge: Update #2

Live Steam by Father Finelli Posted on November 21, 2025 by Fr. Jay FinelliMay 25, 2026

Progress continued on Wednesday with solid momentum. I removed all the rail from the Genaro Trestle to the Mountain Division return switch, clearing the way for the next phase of grading and alignment. As often happens when working on the railroad, the creative imagination starts to run ahead of the shovel and the pry bar.

While clearing ballast from the Shirley Covered Bridge toward the Mountain Division switch, a new idea emerged clearly in my mind: a station siding. I could suddenly see the station nestled neatly between the turntable and the new trestle, creating a charming little scene that feels like it has always belonged there. From that point, the siding would extend roughly 200 feet—beginning just before the station and running back up toward the Mountain Division. In my mind, the small country-style station is already complete, with windows, a door, lighting, and a passenger bench beneath an extended roof. I can see exactly where the siding will diverge from the mainline and where it will rejoin. The picture is fully formed long before a single tie is spiked.

As I worked, I happened to be listening to a friend, a fine detailed woodworker and artist. He spoke about the inner vision of the artist—how they see the finished work in the mind before it ever becomes reality. I couldn’t help but relate. We Live Steamers are artists in our own way. Our canvas is the land; our medium is rail, ballast, wood, stone, and steel. The track, the bridges, the scenery—this is our artwork.

So the railroad continues to evolve, as railroads always do. A project is never truly finished; it simply opens the door to the next idea.

For those of you planning or dreaming about your own line and not sure where to begin, let your imagination run freely. And as Walt Disney once said: “Don’t think outside the box—throw the box away.”

There are a few pictures in the gallery below.

More updates to come as the vision continues to become reality.

Looking toward the Mountain Division switch. Turntable to my right, future station to my left.
Track and ties removed, earth movement has begun.
Looking towards covered bridge with first grading begun.

Posted in News, Railroad | Leave a reply

Raising the Covered Bridge: Mainline Grade Improvements Underway

Live Steam by Father Finelli Posted on November 19, 2025 by Fr. Jay FinelliMay 25, 2026

A major improvement project is underway on the mainline section that runs alongside the turntable, through the Covered Bridge, and onward to the Genaro Trestle. This stretch holds special significance, as it was the first section of track my father and I laid back in September 2005, marking the true beginning of the Nasonville Valley Railroad.
It is remarkable that, after 20 years in the ground, only a handful of ties showed any rot—the vast majority still look almost brand new.

Smoothing Out the Mainline Grade

As it exists today, the mainline drops downhill beside the turntable toward the Covered Bridge, then immediately climbs a steep grade—nearly 4%—from the bridge up to the Genaro Trestle. This abrupt change in elevation has made this segment one of the most challenging parts of the railroad.

To correct this, the Covered Bridge will be raised approximately 15 inches, allowing the entire stretch—from the turntable area through the bridge and up to the trestle—to be reworked to a far more manageable 1.2% grade. This will significantly improve train handling and operational flow.

Relocating the Turntable Lead

Because the existing turntable lead cannot meet the new elevation profile, it will be moved to the opposite side of the turntable. This new alignment will tie smoothly into the regraded mainline.

Preparing Space for Expansion

To make room for the relocated lead and future development, four trees behind the turntable are being removed. This will create the necessary space for the new alignment as well as for a planned three- to four-stall engine house.

Looking Ahead

These improvements will provide a smoother grade, safer operations, and expanded facilities—another significant step forward in the ongoing development of the Nasonville Valley Railroad.

View a few pictures in the gallery below.

Line shows planned grade
Track removed from covered bridge to Mountain Division return switch. Lead to turntable awaiting removal.
View behind turntable cleared for tree removal
From return switch to covered Bridge
View with ties piled until need for another project.
Posted in News, projects, Railroad | Leave a reply

2026 (2025) Projects on the Nasonville Valley Railroad

Live Steam by Father Finelli Posted on October 30, 2025 by Fr. Jay FinelliOctober 30, 2025

Expansion and Improvement Projects

  • Clearing and Preparation:
  • Removing select trees to open corridors for upcoming expansion projects, including space for a new lead from the mainline to the turntable. This adjustment is necessary as the existing lead will be removed when the Shirley Covered Bridge is raised. The cleared area will also accommodate a future expanded engine house.
  • Genaro Trestle Improvements:
  • Modifying and double-tracking the Genaro Trestle to improve traffic flow and operational capacity.
  • Shirley Covered Bridge Elevation:
  • Raising the bridge by 15 inches to reduce the current 3.2% grade to a more manageable 1% incline, enhancing safety and performance for heavier trains.
  • Mainline Grade Reprofiling:
  • Regrading the line from the crossing, around the back of the house, and to the front to achieve a consistent 2.5% grade (previously peaking at approximately 3.3%).
  • Curve Optimization:
  • Standardizing all curve radii to 31 feet, correcting one particularly tight section previously measured at only 21 feet.
  • Bridge Replacement:
  • Replacing the old culvert bridge with a new truss bridge, ensuring improved structural integrity and aesthetic harmony with the railroad’s heritage design.

This may seem ambitious, but much of the work is already underway. If the weather holds for a few more weeks, I should have significant progress made before winter, ensuring a strong start come spring.

Posted in News | 2 Replies

A Dedication from the Heart

Live Steam by Father Finelli Posted on October 16, 2025 by Fr. Jay FinelliMay 25, 2026

On October 11, 2025, we celebrated a milestone in the history of the Nasonville Valley Railroad with the official opening of the Mountain Division. As part of the ceremony and proclamation, I dedicated two beloved structures to the two people without whom this railroad would never have existed—my parents.

The original trestle is now officially named the “Genaro Trestle” in honor of my father, and the covered bridge proudly bears the name “Shirley” in honor of my mother. My father and I built the original 1,750-foot main line together in just two summers, including the trestle, which we completed in an incredible five days. Meanwhile, my mother kept us fueled with endless hot dogs and lemonade and even began painting the trestle herself before we upgraded to a sprayer.

Today, the railroad stretches 3,443 feet, a far cry from those early days. But its foundation isn’t just made of wood, rail, and ballast—it’s built on my parents’ love, support, and encouragement. These dedications are not only fitting and right but a small token of my deep gratitude for the gift of my parents. Their hands and hearts are in every tie, every trestle, and every memory along the line.

📜 A copy of the official hard-bound proclamations issued at the opening of the Mountain Division and the dedications of the Genaro Trestle and the Shirley Covered Bridge can be viewed below.

Posted in News, Railroad | Leave a reply

Post navigation

← Older posts
Newer posts →
  • My Summer Projects Are Now Complete
  • Major Update In Process
  • Nasonville Valley – Roll On
  • Nasonville Valley—Roll On! The Official Railroad CD
  • How Do You Solve a Problem Like Genaro?
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • January 2025
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • December 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • February 2023
  • December 2022
  • November 2022
  • October 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • October 2021
  • August 2021
  • July 2021
  • April 2021
  • December 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • December 2019
  • July 2019
  • October 2018
  • July 2018
  • March 2018
  • February 2018
  • January 2018
  • July 2017
  • December 2016
  • October 2016
  • September 2016
  • August 2016
  • June 2016
  • March 2016
  • February 2016
  • January 2016
  • November 2015
  • October 2015
  • August 2015
  • March 2015
  • December 2014
  • August 2014
  • January 2014
  • December 2013
  • October 2013
  • August 2013
  • July 2013
  • June 2013
  • September 2012
  • August 2012
  • May 2012
  • January 2012
  • October 2011
  • September 2011
  • May 2011
  • January 2011
  • December 2010
  • November 2010
  • October 2010
  • August 2010
  • July 2010
  • March 2010
  • November 2009
  • October 2009
  • August 2009
  • July 2009
  • March 2009
  • February 2009
  • November 2008
  • September 2008
  • August 2008
  • July 2008
  • May 2008
  • September 2007
  • August 2007
  • June 2007
  • April 2007
  • July 2004
  • March 2004
  • June 2003
  • April 2002
  • August 2001
  • March 2001
  • February 2001
  • May 1995
© 1995-2026, Fr. Jay A. Finelli
↑